Public Safety/Community Education/Main Entry Project:  Roofing work finishing up. Insulation and drywall work ongoing.  Site underground utility work ongoing.  Periodic road closures may occur due to deliveries.  Pedestrians and Drivers need to follow closure signs and be cautious as they travel around the construction site.  Main entry sign work to occur periodically.  Closures may occur at the main exit during the sign work.

Student Services Project:  Construction fencing has been installed. This fencing will remain up during the duration of the project. Access between the Forum2/Music building and the Old Library will be closed off after the semester ends for the duration of the project. No access will be available between Cosmetology and the Old Library until the Spring Semester 2016. The restrooms at the northeast corner of the Old Library are closed as well as the access road outside of the old MDF room between the Old Library and Fine Arts. Utility disconnect work ongoing at different locations within the fencing.  Interior wall demo and debris removal ongoing.  Piping work continues on the roof of the Student Center.  Connection to the Central Plant will occur Saturday 12/5. Pedestrians and Drivers need to follow closure signs and flagmen around the site.

Signage Project:  Gothard sign work ongoing. Waiting on confirmation from CVS for the work at McFadden/Goldenwest to start. Fencing for the new Marquee at Edinger/Goldenwest and the parking lot entry signs is going up today in preparation for demolition and grading next week.

Criminal Justice Project:  The berm removal work will be completed by 12/11. The access road between lots G and H will be closed during the day for this work.  The road will be opened up each night after work is completed for the day.  Please follow sign and flagmen directions during this work.

General Construction Update:

Kaplan University Project:  Fencing for this project will be installed on Monday, 12/7.  This will be installed just south of the access road next to the Amphitheater south to the satellite dishes and over to the Theater. This road will remain open other than for some periodic closures for deliveries and utility work.  Notification of these closures will occur when we have dates from Kaplan.

Boys & Girls Club Project:  Multi-use gym is currently targeted to be complete by the end of January with the After school club building by the end of February.